Mesh Leaf Dual
The Mesh Leaf Dual installs between the unit breaker panel and the managed loads — typically a Level 2 EV charger and a heat pump. It monitors the local feeder, receives current limits by mesh radio from the upstream Mesh Core, and enforces them locally so total building load stays inside the approved envelope. The resident's equipment operates normally.
Reads total electrical demand on the service feeders.
Calculates a safe load budget for the building.
Applies the budget locally at each managed stall.
EV chargers today; heat pumps & more on roadmap.
If radio communication with the Core is lost, the Leaf falls back to a conservative configured current — never an unmanaged full-rate draw. CT readings are verified locally before the downstream load circuit is released.
No monthly fees. No per-charge fees. No subscription contracts. 1-year parts & labour warranty, extended options available.